
Missile components
This is what the ledger can account for. Where no figure has been published for a producing country, only the plants and producers a source has named are counted, so the real total is higher.
: 833 per month by Dec 2027
Each country the item is made in, broken down into the producers and plants a source has named. A plant’s figure is part of its country’s, never added to it.
| Scope | Producer | Output / mo | Capacity / mo | Updated | Evidence and chart |
|---|---|---|---|---|---|
| — | — | Old tracker |
Every published figure for one line. The band is the range a source gave; hollow points are estimates; dashed is a target or forecast; grey points were corrected later.
No figures to chart for this line.
| Date | Value | Range | Basis |
|---|
Each announced target or forecast, next to what was reported once its date arrived.
No comparable figure published yet
Every published figure that stands, with the sentence each one rests on. A figure is never edited: a correction is a new figure, and the old one is kept below.
833 per month
by 31 Dec 2027
Carried over from the previous tracker. The source is linked; its exact quote is not on file yet.
Every document behind the figures on this page.
Germany
Lockheed Martin and Rheinmetall teamed up to build a missile and solid rocket motor production facility in Germany, with the expectations to produce 10,000 solid rocket motors and missiles annually. Exact missile types not known, but could include GMLRS and air defense missiles.
Rocket motors and missiles will be respectively split into different items when the data becomes available.
Rocket motor production to begin in 2026 and rockets/missiles in 2027.
10 Oct 2025
B2 means a usually reliable source making a statement that is probably true.