Air defence missiles
Some lines report in other units and are not included in the totals.
Each country the item is made in, broken down into the producers and plants a source has named. A plant’s figure is part of its country’s, never added to it.
Every published figure for one line. The band is the range a source gave; hollow points are estimates; dashed is a target or forecast; grey points were corrected later.
| Date | Value | Range | Basis |
|---|---|---|---|
| 31 Dec 2022 | 10 | — | Official |
| 27 Nov 2024 | 40 | — | Official |
Each announced target or forecast, next to what was reported once its date arrived.
No dated targets or forecasts are recorded for this item.
Every published figure that stands, with the sentence each one rests on. A figure is never edited: a correction is a new figure, and the old one is kept below.
40 missiles per month
stated 27 Nov 2024
Stated for MBDA by Adm. Hervé de Bonnaventure before the Assemblée nationale defence committee, as reached on a ramp “entre 2022 et 2025”.
Beyond the Aster, we have multiplied by four the number of Mistrals produced per month. Between 2022 and 2025, we have gone from ten missiles a month to forty missiles a month.
10 missiles per month
2022
Stated for MBDA by Adm. Hervé de Bonnaventure before the Assemblée nationale defence committee, 27 Nov 2024: the 2022 starting point of the Mistral ramp.
Beyond the Aster, we have multiplied by four the number of Mistrals produced per month. Between 2022 and 2025, we have gone from ten missiles a month
2,000 missiles total
by 25 Jun 2025
The 2,000th Mistral 3, made at Selles-Saint-Denis and handed to the DGA, as announced by MBDA. A running total of Mistral 3 missiles produced.
1,500 missiles total
stated 30 Jun 2025
Joint purchase by nine European countries through the DGA, as stated by MBDA; the countries are not named.