Artillery components · 105mm / 155mm
Fuzes fitted to 105mm and 155mm artillery projectiles: point detonating (M739), multi-option (M782) and the course-correcting Precision Guidance Kit.
This is what the ledger can account for. Where no figure has been published for a producing country, only the plants and producers a source has named are counted, so the real total is higher.
Each country the item is made in, broken down into the producers and plants a source has named. A plant’s figure is part of its country’s, never added to it.
| Scope | Producer | Output / mo | Capacity / mo | Updated | Evidence and chart |
|---|---|---|---|---|---|
| — | — | Stale · Apr 2026 | |||
| Bristol, Pennsylvania | Action Manufacturing | — | — | Stale · Apr 2026 | |
| Northrop Grumman, Rocket Center, West Virginia | Northrop Grumman | — | — | Stale · Apr 2026 | |
| Plymouth, Minnesota | Northrop Grumman | — | — | Stale · Apr 2026 |
Every published figure for one line. The band is the range a source gave; hollow points are estimates; dashed is a target or forecast; grey points were corrected later.
No figures to chart for this line.
| Date | Value | Range | Basis |
|---|
Each announced target or forecast, next to what was reported once its date arrived.
Capacity forecast · United States · Northrop Grumman · Northrop Grumman, Rocket Center, West Virginia
12,000 fuzes per month by Sep 2027
No comparable figure published yet
Capacity forecast · United States · Action Manufacturing · Bristol, Pennsylvania
50,000 fuzes per month by Sep 2027
No comparable figure published yet
Capacity forecast · United States · Northrop Grumman · Plymouth, Minnesota
1,008 fuzes per month by Sep 2027
No comparable figure published yet
Every published figure that stands, with the sentence each one rests on. A figure is never edited: a correction is a new figure, and the old one is kept below.
50,000 fuzes per month
2026–2027
M739 point-detonating fuzes. The budget book’s maximum monthly rate for FY 2027 (minimum sustaining rate 20,000; one shift 35,000).
12,000 fuzes per month
2026–2027
M782 multi-option fuzes. The budget book’s maximum monthly rate for FY 2027 (minimum sustaining rate 2,000; one shift 8,000).
1,008 fuzes per month
2026–2027
Precision Guidance Kits. The budget book’s maximum monthly rate for FY 2027 (minimum sustaining rate 333; one shift 333).
6,818 fuzes total
2026–2027
M782 multi-option fuzes only; part of the 62,777 fuzes ordered for FY 2027.
54,950 fuzes total
2026–2027
M739 point-detonating fuzes only; part of the 62,777 fuzes ordered for FY 2027.
1,009 fuzes total
2026–2027
Precision Guidance Kits only; part of the 62,777 fuzes ordered for FY 2027.
62,777 fuzes total
2026–2027
All artillery fuzes on the budget line: M739, Precision Guidance Kit and M782.
Every document behind the figures on this page.
Bristol, Pennsylvania
United States · Action Manufacturing
operating
Northrop Grumman, Rocket Center, West Virginia
United States · Northrop Grumman
operating
Plymouth, Minnesota
United States · Northrop Grumman
operating
B2 means a usually reliable source making a statement that is probably true.